JIT生産におけるロット工程のスケジューリング手法
柳 在圭, 鳩野 逸生, 富山 伸司, 田村 坦之
pp. 515-521
DOI:
10.5687/iscie.12.515抄録
This paper deals with scheduling methods in a JIT production that includes lot processes. In general, the delayes often occurred in multivolume JIT production systems that include lot processes, because set-up time is increased in the multivolume JIT production. To cope with this difficulty, we propose three scheduling methods to decrease delays and work-in-process inventory in lot processes. Furthermore, we evaluated the methods by numerical experiments.