A Dynamic Scheduling Method for Painting Process with JIT Production System
Jae Kyu Yoo, Masafumi NOGUCHI, Itsuo HATONO, Shinji TOMIYAMA, Hiroyuki TAMURA
pp. 65-71
DOI:
10.5687/iscie.13.65Abstract
Scheduling method have been investigated for Just-In-Time (JIT) production systems with painting process that has longer lead time than the planning period of assemble line, followed by the painting prosess. In such JIT production systems, it is difficult to keep stable production between painting process and assemble line.Therefore, it is necessary that painting process has independent production schedule forecasted on the processing requirement jobs of assemble line. However, when multi-volume production is done or defective jobs occur in painting process, production balance between painting process and assemble line is destroyed, and then delays of due dates often occurred. To cope with this difficulty, we propose a scheduling method based on heuristic algorithm for painting process in the JIT production system in order to prevent delays of due date and to keep the smallest inventory in buffer of painting process. We have evaluated the scheduling method by computer simulation.